Toggle navigation
Toggle navigation
Design & Technical
leaderflush shapland
Design.
Market sectors
>
Health
>
Education
>
Commercial
>
Leisure
>
Residential
>
Performance
>
Fire & smoke
>
Acoustics
>
Security
>
Strength & durability
>
Anti-microbial
>
Radiation shielding
>
Finger protection
>
Privacy
>
Technical.
Leaderflush Shapland
Technical resources
>
Technical guide
>
Standards & legislation
>
Literature & downloads
>
Veneer selector
>
Clear widths calculator
>
Frame drawings
>
Light reflectance values
>
Doorset solutions
>
Integrated
>
Plasform
>
Pivette
>
Designer
>
Sentinel
>
Laidlaw Architectural Ironmongery
>
>
Laidlaw Architectural Ironmongery
>
>
Technical Resources
Doorsets technical.
Technical guide
>
Standards & legislation
>
Literature & downloads
>
Veneer selector
>
Clear widths calculator
>
Frame drawings
>
Light reflectance values
>
>
>
>
>
>
>
Design Magazine
Design magazine
Case studies & project gallery
>
News
>
Contact Us
About Us
Close
Design Magazine
Project gallery
Microsoft Headquarters
Microsoft Headquarters
Sector:
Commercial
Door type:
Designer
The challenge.
The supply of a flush range of performance doorsets to the high end office development area of Cambridge's central business district, Station Road. In collaboration with Wates Construction Leaderflush Shapland supplied over 300 doorsets to the project. The doorsets required need to meet with necessary building regulations and standards.
The solution.
Leaderflush Shapland revives Microsoft Headquarters
Leaderflush Shapland has supplied a range of flush performance timber doorsets to the new Microsoft Research building in Cambridge. The Leaderflush Shapland doorsets offered Wates Construction a best value solution that met both the aesthetic and long-term performance requirements of the project.
The 83,000sqft, six-storey office building forms part of the CB1 master plan for Cambridge, a mixed-use development designed to provide a much needed boost to the heart of the city’s central business district and one of Cambridge’s most popular areas for visitors, Station Road.
Wates Construction specified 328 performance doorsets from Leaderflush Shapland’s Designer and Extended Performance ranges. The doorsets were constructed using the cost effective engineered performance core EnduraCor – its durability and stability make it especially suitable for busy office environments. In a recent independent test, EnduraCor was shown to be one hundred times more durable than multi-layered chipboard, achieving 1,000 more impacts than required by EN1192 Class 4, (at which point, the test was stopped), as well as achieving 2,000,000 cycles, 1,000,000 more than required by EN1191 Class 8. This highly cost-effective solution could significantly reduce ‘whole life’ repair and maintenance costs and may never have to be replaced.
Each doorset was finished with Hygienilac, Leaderflush Shapland’s anti-microbial additive incorporated within the lacquer on all veneered doorsets as standard, which inhibits the risk of infection against harmful bacteria such as E.Coli, Salmonella and Listeria, boasting a proven 99.9% kill rate.
For electrical and server rooms, noise transmission has been dampened by utilising doorsets to meet performance characteristics of up to 46RwdB sound reduction. All doorsets were finished in an American cherry quarter cut veneer, in-keeping with the design values of the project.
John Daltrey, Project Director from Wates Construction commented: “Leaderflush Shapland’s extensive experience and efficient production techniques ensured that even with a large fast track project, such as the Microsoft Research offices, guaranteed the timely delivery quality could be maintained”.
Steve Crease, Operations Director from SJ Eastern Carpentry, sub-contractor for the project, said: “We needed a durable, long-lasting product that looked good. The high acoustic performance criteria were also a crucial requirement, which is why Leaderflush Shapland’s Extended Performance range doorsets were ideal. Through working closely with Leaderflush Shapland and the main contractor, all of the project requirements were easily achieved.”
Garry Hatton, Project Manager from Leaderflush Shapland said: “We pride ourselves on delivering exceptional levels of service and cost-effective, high quality products. From our vast range of doorset solutions, we were able to supply the products that individually suited the different requirements of the Microsoft Research building, from our high acoustic doorsets in the Extended Performance range to our engineered performance core EnduraCor for long-lasting durability.”
Project gallery.
Southmead Hospital
Ockendon Manor Spa
Michael Woods Leisure Centre
Southern General Hospital
Talk to us to see how we can help you.
Our highly skilled team is always happy to share its technical expertise, whether over the phone or face-to-face.
Contact us today
Request a callback
Or call us on
01623 343111
Request a callback
Thank you.
A member of the respective department will get in touch with you shortly.
Regards,
Leaderflush Shapland Laidlaw Team
Request a callback
Thank you.
A member of the respective department will get in touch with you shortly.
Regards,
Leaderflush Shapland Laidlaw Team
Top